National service hotline:008615094320000

资讯中心

Environmental Equipment

Years of experience
solutions across various industries

National service hotline
008615094320000

Wastewater Treatment Plant Project in Jinghe New City Industrial Cluster Area

微信图片_20220127132155.png


Project name: Sewage treatment plant project in Jinghe New City Industrial Cluster Area

Project location: Jinghe New City Industrial Cluster

Processing capacity: 60,000 tons / day

The general contracting construction time is to be completed in June 2022

Mainly includes sewage treatment structures (buildings): sewage (lifting pump pool, ultra-fine grille, two-stage defluoridation sedimentation tank), other sewage (coarse grille and lifting pump pool, fine grille, aeration sedimentation tank ), water distribution well, five-section bardenpho biological tank, secondary sedimentation tank, high-speed air flotation tank, ozone advanced catalytic oxidation tank, contact disinfection tank, ozone preparation room, liquid oxygen station, blower room, and dosing room. Sludge treatment structures (buildings): sludge concentration tank, sludge storage tank, sludge dewatering machine room, etc.


  • Engineering design
  • General engineering contracting
  • Water operations
  • Environmental Equipment

CopyRight © Jiangsu ZEYU Environmental Engineering Co., Ltd.       Su ICP No. 14007113-1

National service hotline
008615094320000

online service

One-on-one professional services
top