Years of experience
solutions across various industries








National service hotline
008615094320000

Project name: Sewage treatment plant project in Jinghe New City Industrial Cluster Area
Project location: Jinghe New City Industrial Cluster
Processing capacity: 60,000 tons / day
The general contracting construction time is to be completed in June 2022
Mainly includes sewage treatment structures (buildings): sewage (lifting pump pool, ultra-fine grille, two-stage defluoridation sedimentation tank), other sewage (coarse grille and lifting pump pool, fine grille, aeration sedimentation tank ), water distribution well, five-section bardenpho biological tank, secondary sedimentation tank, high-speed air flotation tank, ozone advanced catalytic oxidation tank, contact disinfection tank, ozone preparation room, liquid oxygen station, blower room, and dosing room. Sludge treatment structures (buildings): sludge concentration tank, sludge storage tank, sludge dewatering machine room, etc.
Engineering design
General engineering contracting
Water operations
Environmental Equipment 
CopyRight © Jiangsu ZEYU Environmental Engineering Co., Ltd. Su ICP No. 14007113-1