National service hotline:008615094320000

资讯中心

Environmental Equipment

Years of experience
solutions across various industries

National service hotline
008615094320000

Wuxi Guangda Garbage Power Plant Garbage Infiltration Treatment

his project is located in Pushu Village, Yixing City, Jiangsu Province. The treatment object is landfill leachate produced in the power plant garbage pit. The treatment scale is 150m3/d. It adopts the "pretreatment + anaerobic + SBR + ultrafiltration + reverse osmosis" treatment process. The tail water is used for road washing and greening in the factory area. The biogas produced by the anaerobic process is used to generate electricity. Designed inlet water quality COD: 60000~80000mg/L, BOD: 30000~40000mg/L, SS: 6000mg/L, ammonia nitrogen: 2000mg/L; treated tailwater water quality COD: <100mg/L, BOD: <30mg/L , SS: <10mg/L, ammonia nitrogen: <25mg/L.

  • Engineering design
  • General engineering contracting
  • Water operations
  • Environmental Equipment

CopyRight © Jiangsu ZEYU Environmental Engineering Co., Ltd.       Su ICP No. 14007113-1

National service hotline
008615094320000

online service

One-on-one professional services
top